Our Projects
Real-world projects.
Experience from around the globe.
From replacing burners in refineries to assembling suspension bridges. Explore 44 projects, featuring photos taken directly at the worksite.
Showing 44 of 44 projects
South AmericaIndustry and Energy
Burner replacement using an A-Frame
Replacement of two burners using a modular A-Frame structure, in collaboration with Suprotech. A solution for working at heights in confined spaces.
View project
LuxembourgAccess systems
QuikDeck in Luxembourg, Part 3
Installation of an approximately 450 m² suspended work platform beneath a roof. Providing access for the installation of cladding panels onto structural beams.
View project
LuxembourgAccess systems
QuikDeck in Luxembourg, Part 2
Preparation of approximately 120 m² of suspended working area for the installation of cladding panels. Access provided without the need for extensive ground-based scaffolding.
View project
LuxembourgAccess systems
QuikDeck under a glass roof
Approximately 850 m² of working area beneath a future glass roof. Steel beams served as anchor points for the suspension system.
View project
North SeaAccess systems
QuikDeck beneath an accommodation unit
Installation of an approximately 100 m² suspended platform beneath an accommodation module. Existing anchor points were tested prior to installation.
View project
Yanbu, Saudi ArabiaIndustry and Energy
Replacement of burners on a 200 m tower
Rigging and rope access for the replacement of three burners on a 200-meter-tall tower in Yanbu. Handling performed using a long-boom crane.
View project
Rijswijk, NetherlandsBuildings and Bridges
Glass façade of the Patent Office
Cladding work on the 120-meter-tall Patent Office building. Installation and finishing tasks on the glass façade.
View project
Al Jubail, Saudi ArabiaIndustry and Energy
Replacement of burners at a refinery
Work on a 120-meter-tall tower featuring two large burners and one smaller burner. An access solution for a confined space within the refinery during a shutdown.
View project
NetherlandsAccess systems
Suspended platform at the ESKA plant
Installation and dismantling of the QuikDeck system at a paper mill. The working platform provided access to the ceiling while allowing production activities to continue.
View project
Al Jubail, Saudi ArabiaIndustry and Energy
Maintenance and installation work in Jubail, Saudi Arabia
Replacement of burners, inspection and coating of the Monoseal system and the lifting system. The scope included welding and electrical installation work.
View project
Zutphen, NetherlandsAccess systems
QuikDeck used during bridge renovation
Suspended access system for a bridge renovation project, in collaboration with SkyAccess. Preparation of the work area for sandblasting, repairs, and painting.
View project
North SeaAccess systems
QuikDeck on an offshore platform
Suspended scaffolding on a Shell platform, executed for SkyAccess. A modular work platform for technical operations beneath the structure.
View project
Kalimantan, IndonesiaIndustry and Energy
Replacement of two burners in Kalimantan
Replacement of burners on two towers located in the jungle for Total NPU Indonesia. The work was carried out during a scheduled shutdown.
View project
The Hague, Netherlands · 2016Buildings and Bridges
Hoftoren, continuation of renovation work
Ongoing work on the roof and cladding of the Hoftoren building. Rope access operations on a high-rise office building in the center of The Hague.
View project
Geoje-si, South KoreaOffshore and Marine
Platform lifting at the DSME shipyard
Lifting operations for an offshore platform using ALE’s Mega Jack system. Carried out at the DSME shipyard for the Chevron Wheatstone project.
View project
North SeaOffshore and Marine
Electrical installations on a drilling platform
Installation of cable systems for the control and instrumentation rooms of a drilling platform. The work included routing cables from the exterior to the interior.
View project
NorwayOffshore and Marine
Replacement of ship tank linings
Replacement of protective plastic panels inside cargo ship tanks. Rope access work in a space characterized by high walls and sharp angles.
View project
The Hague, Netherlands · 2015Buildings and Bridges
Hoftoren roof renovation
Roof restoration work on the Hoftoren office building. Accessing and maintaining structures using rope access techniques.
View project
Rotterdam, NetherlandsOffshore and Marine
Preparation of the Sea Fox 2 platform for NDT
Cleaning the legs of the Sea Fox 2 platform at Keppel Shipyard. Removal of deposits prior to non-destructive testing (NDT) of designated welded joints.
View project
Rotterdam, NetherlandsOffshore and Marine
Rigging at the Heerema facility
Rigging and preparation of materials for crane handling during the construction of an offshore structure. Carried out in collaboration with SkyAccess.
View project
Al Jubail, Saudi ArabiaIndustry and Energy
Comprehensive maintenance of a flare tower
Replacement of the flare tip and monoseal, welding of supports, and renewal of electrical wiring. The scope also included work on gas panels and structural painting.
View project
Capelle, NetherlandsBuildings and Bridges
Window cleaning for residential buildings
Window cleaning on residential buildings using rope access. Work on facades with difficult access.
View project
Jubail, Saudi ArabiaIndustry and Energy
Dismountable flare at a height of 130 m
Handling of piping components for a dismountable flare tower. Operations involving winches and pulley systems during a flare replacement.
View project
Crane vessel *Hermod*Offshore and Marine
Work on the crane vessel *Hermod*
Technical operations on a Heerema crane vessel. A project involving large-scale floating heavy-lift equipment.
View project
MalaysiaIndustry and Energy
Replacement of piping and flares at MLNG
Dismantling and installation of two piping branches and two new flares at the MLNG refinery. Collaboration with the Dutch company Conbit.
View project
South KoreaOffshore and Marine
Mega Jack system lifting a platform
Work related to the lifting of a drilling platform using ALE’s Mega Jack system. Preparation of the structure for subsequent transport.
View project
North Sea, GermanyOffshore and Marine
GT1 in the German sector of the North Sea
Continuation of the GT1 project following its relocation from Rotterdam. Installation of an offshore structure for a wind energy connection.
View project
Batam, IndonesiaOffshore and Marine
Reconstruction of the Atlantic London platform
Visual and magnetic particle inspections during the conversion of a drilling rig into an accommodation unit. Work carried out as part of an extensive reconstruction project.
View project
Bay of Bengal, IndiaOffshore and Marine
Offshore flare tip replacement
Preparation and replacement of flare tips on an offshore vessel. The procedure had to account for both the limited workspace and the movement of the vessel.
View project
North SeaOffshore and Marine
Strengthening of the Total K6-PP platform
Installation of beams and a lifting structure within the confined space of the platform. Rigging operations for handling accommodation modules located beneath the helideck.
View project
Rotterdam, NetherlandsOffshore and Marine
Maintenance of the Scarabeo 6 platform
Coating, NDT inspections, and modifications to work platforms on the Scarabeo 6. The scope of work also included inspections and dismantling within the leg structures.
View project
Hardanger, NorwayBuildings and Bridges
Assembly of the Hardanger Bridge
Rope access and assembly work on a suspension bridge in the Norwegian fjords. The project combined work on a large-scale structure with challenging access conditions.
View project
Rotterdam, NetherlandsOffshore and Marine
Installation work in the GT1 module
Installation of steel beams inside the module. Additional installation work performed beneath the helideck and on other sections of the offshore structure.
View project
Manifa, Saudi ArabiaIndustry and Energy
Construction of towers at the Manifah refinery
Assembly of free-standing flare towers during refinery construction. Sequential lifting of components and tensioning of guy wires.
View project
North SeaOffshore and Marine
Flare tip replacement for Dana Petroleum
Replacement of a flare tip, cable trays, and structural components. Technical operations in an offshore environment.
View project
QatarIndustry and Energy
Maintenance of a Qatar Gas flare tower
Replacement of a flare tip on a 200-meter-tall tower using winches and pulley systems. Additional modifications to piping and cable routing.
View project
Nitra, SlovakiaBuildings and Bridges
Steel structures on residential buildings
Installation of steel support structures for satellite equipment. The access strategy was designed to protect the restored facades of the residential buildings.
View project
Balikpapan, IndonesiaIndustry and Energy
Flare tip replacement in Balikpapan
Replacement of an approximately 2.5-ton flare tip using a winch mounted on a vessel. A specialized auxiliary structure was prepared for the operation.
View project
DenmarkOffshore and Marine
Anode replacement on the Maersk Guardian
Removal of old anodes and installation of new ones on the Maersk Guardian platform. Weld inspection using the MPI method and preparation of access for NDT inspectors.
View project
Rotterdam, NetherlandsOffshore and Marine
Maintenance of the Magallen platform
Removal of old anodes and installation of new ones. Additional dismantling of damaged steel plates within the structure.
View project
BelgiumIndustry and Energy
Cleaning of Pami equipment/technology
Cleaning of the upper sections of stackers and walls. Access to the equipment via rope access.
View project
Haifa, IsraelIndustry and Energy
Refurbishment of burner towers at Haifa ORL
Replacement of burners and monoseals; painting and installation of steel platforms. The project was executed in stages across two tall towers.
View project
CuraçaoIndustry and Energy
Structural refurbishment at the ISLA refinery
Replacement of extensive sections of a tower structure and installation of working platforms. Welding, steel modifications, and painting in accordance with project drawings.
View project
The Hague, NetherlandsBuildings and Bridges
Replacement of steel reinforcements
Replacement of steel reinforcements supporting the rail track for a service carriage. Installation work on a structure running around the building.
View projectNo project found for this query. Please try a different location or clear the filter.