
← All Projects
Balikpapan, Indonesia / Industry and Energy
Flare tip replacement in Balikpapan
Replacement of an approximately 2.5-ton flare tip using a winch mounted on a vessel. A specialized auxiliary structure was prepared for the operation.
Project Execution
Work performed directly
on-site.
In Indonesia, we were contracted to replace a flare tip. To replace the 2.5-tonne flare tip, we utilized a winch on a vessel along with a custom-built structure designed specifically for this task.






















