Strengthening of the Total K6-PP platform
Installation of beams and a lifting structure within the confined space of the platform. Rigging operations for handling accommodation modules located beneath the helideck.
Project Execution
Work performed directly
on-site.
For the Total project, we first reinforced the entire platform using numerous beams—a task that required extensive rigging within a confined space. We also constructed a support structure and installed a winch system designed to lift two 40-ton accommodation modules into position beneath the helideck. This process also necessitated significant rigging work and various associated tasks.