Rigging and preparation of materials for crane handling during the construction of an offshore structure. Carried out in collaboration with SkyAccess.

Project Execution

Work performed directly
on-site.

Another project carried out under SkyAccess at the Heerema facility in Rotterdam, where we performed rigging (securing loads) for cranes used in the construction of an offshore platform. Heerema was one of the first companies in Europe to manufacture extraction platforms and modules. Over the last three decades, Heerema has produced hundreds of offshore steel structures at its facilities, with a total weight exceeding 550,000 tons.