Norway Ropeaccess project in one of the carrier ship for transfer stones and small materials. Inside the tanks for transfer material we change all plastics plates on walls. Because the tanks was 12m high and on sharp angels we had to use only ropeaccess installation of plates. Old plates was removed, joints was grinded and clean and replace for new. New plastic plates was welded.