Norway
Ropeaccess project in one of the carrier ship for transfer stones
and small materials. Inside the tanks for transfer material we change
all plastics plates on walls. Because the tanks was 12m high and on
sharp angels we had to use only ropeaccess installation of plates.
Old plates was removed, joints was grinded and clean and replace for
new. New plastic plates was welded.