Malaysia In October 2013 we are completed the removal and installation of two retractable flares and
installation of two new flare tips in MLNG refinery in East Malaysia with partnership of Dutch company CONBIT.
In a retractable flare, one flare stack can be lowered while the other remains in operation.
This allows maintenance activities to be performed at ground level without decreasing the flare
capacity too dramatically. The required activities involved the replacement of both flare tips
and the installation of new miter parts. The project was successfully completed in 5 weeks.