India – Bengal Sea

India – Bengal Sea Very demanding and challenging project for prepare and exchange flare tips. The whole difficulty lay in the fact that the flare tips have changed on the ship, which was on the high seas. The total area was limited and had to count breaker that moving ship from side to side throughout the process of exchange flare tips. The tower was 100 meters high and we built special frame construction, with which all raised the parts for replacement. With the help of the guide wires which was fixed on based special frame on top of tower we use them to run and lift the main flare tip weighing 3.5 tons. The project included the replacement of the main flare tip, overfill smaller flare tip, exchange electric installation and removal of the original frame which was build for e xchange flare tips.