Saudi Arabia - Manifah

Saudi Arabia - Manifah Construction of new refineries in Manifah included a self-standing tower with a burner for flaring. Each tower is composed of three parts, each had about 20 meters. Every single part had to be stretched and razed it to be mounted next section. Tension be done by wire ropes anchored at three points. Each rope had to be stretched by a specified weight, the deflection of the tower would be only tolerance from 0 to 10 mm. The maximum tension of a single wire rope is 24 tons.