ensk

Home

We are members of international corporation IRATA and we do works at heights, where it is not possible or it is too expensive to use scaffoldings, work platforms or cranes.

We are available all around the world, we are flexible, communicative and adaptable for a lot of kinds of works with ropes.

We perform our assignments very fast and with profit for you. We will make your project according to your specifications and in addition we offer you to make a proposal of technological procedure, choice of materials and of course the price list.

Our main goal is to perform good, fast and safe work.

Flare Tip Replacementpointer
Q.D. – Luxembourg part 3pointer
Q.D. – Luxembourg part 2pointer
Q.D. – Luxembourg part 1pointer
Q.D. – Offshore North Seapointer
Saudi Arabiapointer
Netherland - Rijswijk 2018pointer
KSA - Jubailpointer
Quik Deck - ESKApointer
KSA - Jubail PKpointer
QDC - Bridge/NLpointer
Quick Deck Systempointer
Indonesia - KALIMANTANpointer
Netherland - Hoftoren 2016pointer
South Korea - DSMEpointer
North Seapointer
Norwaypointer
Netherland - Hoftoren 2015pointer
Netherland - Rotterdampointer
Netherland - Heermapointer
Saudi Arabia - Al Jubailpointer
Netherland - Capellepointer
Saudi Arabia - Jubailpointer
Heerma Hermondpointer
Malaysiapointer
Koreapointer
North sea – GT1pointer
Indonesia – Batampointer
India – Bengal Seapointer
North Sea - Totalpointer
Rotterdam - Saipempointer
Norway - Hardanger Bridgepointer
Rotterdam - GT1pointer
Saudi Arabia - Manifahpointer
North sea - Dana Petroleumpointer
Qatar - Qatar Gaspointer
Slovakia - Nitrapointer
Indonesia - Balikpapanpointer
Denmark - Maerskpointer
Rotterdam - Magallenpointer
Belgium - Pamipointer
Israel - Haifa ORLpointer
Curaçao - ISLApointer
Den Haagpointer
Project ImageFlare Tip Replacement

Replacing a flare tip requires working on great heights with limited space. Designing the safest and most efficient replacement method and equipment is therefore of utmost importance. The A-Frame is...

Project ImageQ.D. – Luxembourg part 3

We had to build around 450m2 of QuikDeck under the roof to prepare a floor for cladding panels installation on the beams. Because of the safety factor it was not possible to do cladding from the...

Project ImageQ.D. – Luxembourg part 2

We had to build around 120m2 of QuikDeck under the roof to prepare a floor for cladding panels installation on the beams. Because of the safety factor it was not possible to do cladding from the...

Project ImageQ.D. – Luxembourg part 1

We have to build around 850m2 of QuikDeck under a glass dome structure to prepare a floor for roof windows installation on top of the beams. We use steel beams as anchor points for installation of...

Project ImageQ.D. – Offshore North Sea

We have to build around 100m2 of QD platform under the accommodation unit. Because the QD system is very light, strong and fast to build compare the scaffolding this was the best option. We use...

Project ImageSaudi Arabia

Again a big project in Saudi Arabia that included Rigging and Rope Access job. One of the biggest Flares in KSA 200m heigh tower in Yanbu. We had to replace 3 Flare tips – (HP, LP and Acid). For...

Project ImageNetherland - Rijswijk 2018

Rijswijk 2018 cladding project on new 120m building of future Patent Office in Neherland. All building is cover from glass. This glass is mounted on window frames...

Project ImageKSA - Jubail

Another project from Saudi Arabia in city Al Jubail. Fler was 120m high and hold 2 big and 1 small flare tip. Because Fler was build in the middle of plant and...

Project ImageQuik Deck - ESKA

ESKA is company in North of Holland what make paper as a product. Is older factory where need remove old azbest ceiling. The Quik Deck system was good to do it fast, safe and with...

Project ImageKSA - Jubail PK

Another project from Saudi Arabia in city Al Jubail. This project involves a lot of adjustments as - Fler Tip Exchange + painting monoseal and David...

Project ImageQDC - Bridge/NL

(Quick Deck System) First project with ,,hanging scaffolding,, - Quik Deck System – what we did on land in the Netherlands. All project was coordinate by SkyAccess B.V. in city...

Project ImageQuick Deck System

By SkyAccess B.V. we did hanging scaffold Quik Deck System in North Sea platform what was belong to Shell company. QuikDeck system offers the advantage of working...

Project ImageIndonesia - KALIMANTAN

After five years we returned back to exchange of two Flare tips that are located in two towers in the jungle Indonesian island of Kalimantan for Total NPU Indonesia....

Project ImageNetherland - Hoftoren 2016

Continue work on Hoftoren in Den Haag. Hoftoren is 29-storey and 141.86 m tall building in The Den Hague. It is the third tallest building in the city, and the eighth highest in the...

Project ImageSouth Korea - DSME

Another big project in South Korea. Through "Mega Jack system" by ALE company we lifting new oil platform, which is prepare for the Chevron...

Project ImageNorth Sea

Offshore project in the North Sea on drilling rig, as we installed an extra electrical cabling for inspection and control rooms. The work involved...

Project ImageNorway

Ropeaccess project in one of the carrier ship for transfer stones and small materials. Inside the tanks for transfer material we change all plastics...

Project ImageNetherland - Hoftoren 2015

Hoftoren is 29-storey and 141.86 m tall building in The Den Hague. It is the third tallest building in the city, and the eighth highest in the...

Project ImageNetherland - Rotterdam

At the port of Rotterdam Keppel Verlome we cleaned the legs on the platform Sea Fox 2 for NDT inspection. Control was done by 70 meters at...

Project ImageNetherland - Heerma

Rigging project by SkyAccess in Heerma Fabrication group in Zwijndrecht in Rotterdam, Netherland. Heerema Zwijndrecht was one of the first companies...

Project ImageSaudi Arabia - Al Jubail

This project involves a lot of adjustments as - Flare Tip Exchange + monoseal, welding new extra supports for E&I instalation the new power lines,...

Project ImageNetherland - Capelle

Window Cleaning of Residential homes in city Capelle. After a long time we got a window cleaning job and certainly this is one of the most strive jobs...

Project ImageSaudi Arabia - Jubail

We worked on a demountable flare of height of 130 meters, build up of 7 risers, each riser was 18m long, measured 42 "and weighed 8tons. Flare tip alone weighed 2.5...

Project ImageHeerma Hermond

Crane ships HEERMA companies are among the largest in the world. Crane Ship (SSCV) Hermod was built in Japan in 1978 by Mitsui Engineering & Shipbuilding Ltd. Ship Hermod has two cranes that can...

Project ImageMalaysia

In October 2013 we are completed the removal and installation of two retractable flares and installation of two new flare tips in MLNG refinery in East Malaysia with partnership of...

Project ImageKorea

We had the opportunity to participate and help a new project in South Korea, which took place the largest and heaviest lift ever. Through "Mega Jack system" by ALE...

Project ImageNorth sea – GT1

GT1 project has continued from Rotterdam to the German North Sea sector, which has been installed in order to connect the windmill. GT1 is the first offshore wind...

Project ImageIndonesia – Batam

Standing oil platform,, Atlantic London,, is reconstructed from a drilling system for accommodation unit because is accommodation shortages of workers working at sea. The platform...

Project ImageIndia – Bengal Sea

Very demanding and challenging project for prepare and exchange flare tips. The whole difficulty lay in the fact that the flare tips have changed on the ship, which was on the high...

Project ImageNorth Sea - Total

On project Total we brace up all platform with many beams, that required a lot of rigging in narrow space. We also built a structure and winches whose function was to lift two 40...

Project ImageRotterdam - Saipem

Work on Scarabeo 6 included painting of the legs ceilings in the rooms of winches, extra work platforms under the deck, NDT inspection of steal ears, inspection pipes inside...

Project ImageNorway - Hardanger Bridge

It is one of the longest hanging bridges in the world which is build in Norway. It is long 1300m and is situated in the beautiful Norwegian fjords –Hagandenrbrue bridge. There...

Project ImageRotterdam - GT1

On Project GT1 we did instillation of beams inside of module. We also install clamps under neat a helli deck, painting of legs, and a lot of additional jobs around of GT1....

Project ImageSaudi Arabia - Manifah

Construction of new refineries in Manifah included a self-standing tower with a burner for flaring. Each tower is composed of three parts, each had about 20 meters. Every single...

Project ImageNorth sea - Dana Petroleum

On Project Dana we change Flare Tip, cabletrase, and parts of construction.

Project ImageQatar - Qatar Gas

This project included the replacement flare tip on 4 flare tower 200 meters high. This flare was demountable piece by piece. We had to pass nine pieces of pipes...

Project ImageSlovakia - Nitra

To reduce the reasonable expenses of owners of flats in prefabricated houses we assembled steel constructures whitcht will serve as a carrier of TV satellites and also to...

Project ImageIndonesia - Balikpapan

They hired us up to Indonesia to change Flaretyp. For flaretyp change we use winch placed an the bout, and special construction build for this purpose.

Project ImageDenmark - Maersk

Work in Denmark an Oil rig - Maersk Guardian consist in dismounting of old anodes and mounting new one. All welds on the anodes had to bee check with MPI. We also did some...

Project ImageRotterdam - Magallen

Our work in Rotterdam consist in removing old anoids, and installing new ones, alongside it, we remove old plates

Project ImageBelgium - Pami

The work was divided into several stages which are made of 2 towers of 100m height. The main part of exchange of flare tips and monocular seal, painting riser pipes and platforms,...

Project ImageIsrael - Haifa ORL

The work was divided into several stages which are made of 2 towers of 100m height. The main part of exchange of flare tips and monocular seal, painting riser pipes and platforms,...

Project ImageCuraçao - ISLA

Our work in island Curacao consist of exchange of almost all parts of construction, and installation of platforms. This kind of work include a lat welding, work according plans,...

Project ImageDen Haag

We have changed iron braces, that been holding trackage at this project.