Rotterdam - Saipem Work on Scarabeo 6 included painting of the legs ceilings in the rooms of winches, extra work platforms under the deck, NDT inspection of steal ears, inspection pipes inside the legs, removing scaffolding pipes from legs. The most difficult part was the rigging ropes where less experience climbers had big problem because access was very difficult. The works were we carried out to 40m and used all the standard climbing technique.